01
What a run of show needs
A run of show is the schedule the whole crew calls the event from. Ours has the columns that matter on show day:
- # – the segment number the show caller uses
- Start – the clock time the segment begins
- Duration – in minutes, so overruns are easy to spot
- Title – the segment: walk-in, opening video, keynote, panel, award, break
- Notes – mics, playback, lighting, stage changes
The file is called run-sheet-template: run of show, run sheet and running order are the same document with different names. See what a run sheet is for the full list.
02
Tips for an event or conference
- 1Give every segment a number, including walk-in, breaks and walk-out. They are moments the lighting changes too.
- 2Put each speaker or award on its own row, so each gets its own cue.
- 3When a segment is added late, number it between its neighbours (4.5) instead of renumbering the rest.
- 4Change the version number at the top every time you send it out, and say what changed.
- 5Send it as Excel, Word or a PDF exported from them – not a scan.
03
From run of show to lighting cues
The lighting operator can drop the file into CueSetter and get a grandMA3 macro that builds one named cue per segment, numbered like the run of show. It works the same with a run of show you didn’t make from this template, as long as it is a PDF, Word or Excel file.
Working on a concert or a TV show instead? The running order template explains set lists and sub-cues.