Skip to content
CueSetter

Explained

What is a run sheet?

A run sheet is the minute-by-minute plan of a show or event: every item in order, with a number, start time, duration and what happens. Production writes it, and stage management, sound, lighting and video run the show from it.

01

What a run sheet contains

Most run sheets are a table with one row per item. The usual columns are:

  • # – the item number, used on intercom (“standby item 12”)
  • Start – the clock time, often with Duration or End
  • Title – what happens: a speech, a song, an award, an interval
  • Notes per department – sound, lighting, video, stage and presenters

At the top there is usually the show’s name, date, venue and a version number, because the run sheet changes right up until the doors open.

02

Other names for a run sheet

The same document has many names, depending on country and type of production:

NameWhere it’s used
Run sheetEvents, concerts, corporate shows (UK, Australia)
Running orderConcerts, TV, festivals (UK)
Run of show (ROS)Corporate events and conferences (US)
RundownTV, broadcast and livestreams
Show flow / show running orderEvents and galas
Cue sheetTheatre; also the music reporting form for broadcasters
Kjøreplan, kjøreliste, dreiebokNorwegian
Körschema, körplanSwedish
Køreplan, drejebogDanish
Ablaufplan, RegieplanGerman
DraaiboekDutch
Conducteur, dérouléFrench
EscaletaSpanish
ScalettaItalian

A set list – the songs in a concert – is often part of the run sheet. A call sheet is something else: it tells the crew when to arrive.

Free templates under two of these names: run of show template and running order template.

03

Run sheet vs. cue list

The run sheet is the plan for everyone. A cue list is the lighting operator’s version of it on the console: one cue for each moment the lighting changes, numbered and named so the operator can follow the stage manager’s calls.

On a grandMA3 the cue list is a sequence. Building it means typing every item from the run sheet into the console by hand – or letting CueSetter read the run sheet and make a macro that builds it.

04

How to write a run sheet the lighting desk can use

  • Give every item a number, and keep the numbers when items move. Use 12.5 for an item squeezed in.
  • One row per item, with the start time in its own column.
  • Put a set list on separate lines in the title cell, so the songs can become sub-cues.
  • Send it as Word, Excel or a PDF exported from them – not a scanned page.
  • Put a version number and the date at the top.

Our free run sheet template for Excel and Word follows these rules.

Questions

Frequently asked questions

Who writes the run sheet?

Usually the producer or the stage manager. It is sent to everyone working on the show and updated as the plan changes.

What is the difference between a run sheet and a cue list?

The run sheet is the plan for the whole show. A cue list is a department’s version of it on their own equipment – for lighting, the sequence of cues on the console.

What is the difference between a run sheet and a call sheet?

A run sheet describes the show, item by item. A call sheet tells the crew and performers when and where to arrive.

Run sheet in. Cue list out.

Try it with your next run sheet, or see how it works with our sample.